Company
design-reuse.com
dr-embedded.com
D&R Events
登录
www.design-reuse-china.com
搜索,选择,比较,与提供商进行安全高效的联系
Design & Reuse We Chat
D&R中国官方微信公众号,
关注获取最新IP SOC业界资讯

62 new fabs coming on-line in 2017-20

62 new Front End facilities are expected to begin operation between 2017 and 2020, says SEMI.

By David Manners , Dec. 14, 2016 – 

The 62 facilities and lines range from R&D to high-volume fabs. Most of the newly operating facilities will be volume fabs; only seven are R&Ds or Pilot facilities.

IMG_0460

Between 2017 and 2020, 26 facilities and lines begin operation in China, about 42 percent of the worldwide total currently tracked by SEMI. The Americas region follows with 10 facilities, and Taiwan with 9 facilities.

By product type, 32% are foundries, 21% are Memory, 11% LED, then Power, MEMS, Logic, Analog, and Opto, in decreasing order.

Between 2017 and 2020, five facilities are unconfirmed, 10 are planned, 11 are announced, 26 are in construction and 10 are equipping. These numbers include facilities and lines of all probabilities, including unconfirmed projects and projects which have been announced, but may have a low probability of completion.

Click here to read more ...

 Back

业务合作

广告发布

访问我们的广告选项

添加产品

供应商免费录入产品信息

© 2023 Design And Reuse

版权所有

本网站的任何部分未经Design&Reuse许可,
不得复制,重发, 转载或以其他方式使用。